Fairfield County Utilities

2026 Water/Wastewater Connection Fees

WATER

Water Connection Fees Based on Line Size
Meter/Line SizeConnection Fee
3/4"$5,984.00
1"$9,480.00
1 1/2"$19,346.00
2"$32,703.00
3"$70,094.00
4"$121,277.00
6"$258,047.00
8"$480,004.00

WASTEWATER

Wastewater Connection Fees Based on Line Size
Meter/Line SizeConnection Fee
3/4"$7,114.00
1"$12,699.00
1 1/2"$25,112.00
2"$49,024.00
3"$102,059.00
4"$168,339.00
6"$340,253.00
8"$620,229.00

The connection fee for a service line used solely for fire protection shall be twenty (20) percent of the connection fee shown in the above fee table based on the fire service line size