  Fairfield County Subdivision Regulations

 

- Fairfield County Major Subdivision Regulations

- Minor Subdivision (Lot Splits) Procedures 

Fairfield County Major Subdivision Regulations (.pdf)

Fairfield County Major Subdivision Regulations (.doc) 

 

Major subdivisions

Major subdivisions are the division of land which involve more than five (5) lots or the opening, widening, or extension of streets, or the establishment of new easements. The major subdivision review process is outlined in the Fairfield County Subdivision Regulations manual, which is available for review or purchase in the Regional Planning office

For a free copy of Adobe Acrobat Reader click .

 

Minor Subdivision (Lot Splits) Procedures  

Minor subdivisions are the division of land which do not involve the opening, widening, or extension of streets, or the establishment of new easements, and involve no more than five (5) lots.   Below are the procedures for lot splits:

 

SUBDIVISION ( LOT SPLIT ) RECOMMENDATIONS
FOR PARCELS RANGING FROM
30,000 SQUARE FEET TO 5.01 ACRES

1.     COUNTY ENGINEER/ODOT - Prior to submitting to the RPC you must have approval from the Fairfield County Engineer's Office or (ODOT, if the road frontage is on a state highway) for access.  NOTE: THE FAIRFIELD COUNTY ENGINEER 'S OFFICE AND OR ODOT WILL DO A PRELIMINARY REVIEW OF YOUR PROPOSED SPLIT .  AT THE TIME OF SUBMITTING TO THE RPC THE BLUE FORM APPLICATION MUST HAVE BEEN SIGNED BY THE COUNTY ENGINEER 'S OFFICE OR A LETTER OF APPROVAL FROM ODOT.

  2.    FAIRFIELD COUNTY UTILITIES DEPARTMENT (Third Floor of the County Court House) - A preliminary review form must be completed by the Utilities Department to determine if public water and sewer are available.  A copy of the signed form must be attached to the application (blue form).  If it is determined public water and sewer are not available proceed to the County Health Department.  The County Utilities Department review forms may be obtained from the Regional Planning Office or Utilities Department.

  3.    COUNTY HEALTH DEPARTMENT - Prior to submitting to the RPC, Health Department approval is required.  The Fairfield County Health Department is located on State Route 37 across from Ohio University-Lancaster.  The Health Department will do a preliminary review.  NOTE:  THE HEALTH DEPARTMENT MUST ALSO SIGN THE BLUE FORM APPLICATION.

  4.    SURVEY- The survey must be done by a certified surveyor.  Your surveyor will provide you a certified survey drawing and legal description.

  5.    DEED -  A deed must be submitted and include the Grantor (seller) and Grantee (buyer).  Without this information your subdivision will be denied.

  6.    GIS CENTER (MAPROOM) - Located in the County Courthouse 1st Floor.  You must have your survey drawing, legal description, and deed to be issued a Blue Form Application.  NOTE: LEGAL DESCRIPTION AND SURVEY MUST BE THE ORIGINAL, SIGNED IN INK BY THE SURVEYOR.  PHOTO OR FAXED COPIES WILL NOT BE ACCEPTED.

 7.  REGIONAL PLANNING -  Located in the County Courthouse 1st Floor.  The RPC Office requires the survey drawing, legal description, deed, and the Blue Form Application with all required signatures.  There is a one-hundred twenty five ($125.00) dollar fee for the subdivision (lot split).

 

 

SUBDIVISION (LOT SPLIT) RECOMMENDATIONS
FOR PARCELS GREATER THAN 5.01 ACRES

  1.    COUNTY ENGINEER - Prior to submitting to the RPC you must have approval from the Fairfield County Engineer's Office or ODOT, (if the road frontage is on a State Highway) for access.  NOTE:  THE FAIRFIELD COUNTY ENGINEER'S OFFICE OR ODOT WILL DO A PRELIMINARY REVIEW OF YOUR PROPOSED SPLIT.  AT THE TIME OF SUBMITTING TO RPC THE BLUE FORM APPLICATION MUST HAVE BEEN SIGNED BY THE COUNTY ENGINEER'S OFFICE OR A LETTER OF APPROVAL FROM ODOT.

  2.   SURVEY - Must be done by a Certified Surveyor.  Your surveyor will issue you a certified survey drawing and a legal description.

  3.    DEED - A deed must be prepared and include the Grantor (seller) and Grantee (buyer).  Without this information your subdivision will be denied.

  4.    GIS CENTER - County Courthouse, 1st Floor.  You must have your survey drawing, legal description, and deed to be issued the Blue Application Form.  NOTE:  THE LEGAL DESCRIPTION AND SURVEY MUST BE THE ORIGINAL SIGNED IN INK BY THE SURVEYOR.  PHOTO OR FAXED COPIES WILL NOT BE ACCEPTED.

  5.   REGIONAL PLANNING COMMISSION - Located in the County Courthouse 1st Floor.  The RPC Office requires the survey drawing, legal description, deed, and the Blue Form Application with all the required signatures.  There is a one-hundred twenty five ($125.00) dollar fee for the subdivision (lot split).

  *Per the Fairfield County Subdivision Regulations Health Department Approval is not required to approve lot splits greater than 5.01 acres.  However, it is recommended that if the parcel is intended to be used as a building site that a preliminary review is done by the Fairfield County Utilities Department for the availability of public water and sewer.  If public water and sewer are not available proceed to the County Health Department prior to your survey to determine if a well and septic system may be placed on the site.

Top

 

SUBDIVISION ( LOT SPLIT ) RECOMMENDATIONS
FOR PARCELS BEING TIED TO EXISTING PARCELS

1. SURVEY - Must be done by a Certified Surveyor.  Your surveyor will issue you a certified survey drawing and a legal description.

 2. DEED - A deed must be prepared and include the Grantor (seller) and Grantee (buyer).  The following legal paragraph must be on the deed:

       “This parcel shall not be utilized as a separate building site until approved by the existing planning agency with platting authority over the area.  Unless such approval is obtained, this parcel shall be used in conjunction with the parcel recorded in Volume                     Page     Deed Records, Parcel No.         Fairfield County , Ohio (marginal notation required).”

 Without this information your subdivision will be denied.

 3.  GIS CENTER - County Courthouse , lst floor.  You must have your survey drawing, legal description, and deed to be issued the blue form.

 4.  REGIONAL PLANNING COMMISSION - County Courthouse , 1st Floor.  The RPC office requires the survey drawing, legal description, the deed, and the blue form for approval.  There is a one-hundred twenty five ($125.00) dollar fee for the subdivision (lot split).

Top

AS OF AUGUST 9, 2007 THE FAIRFIELD COUNTY HEALTH DEPARTMENT REQUIRES LOTS TO BE A MINIMUM 0F 2.0 ACRES OR MEET TOWNSHIP ZONING WHICHEVER IS GREATER.

LOT SPLIT REQUIREMENTS

Township Zoning District Area Minimum ROAD FRONTAGE (MINIMUM) SPECIAL INSTRUCTIONS
AMANDA A-1

 

 

A-2

 

 

R-1

 

2.0 ACRES

 

 

2.0 ACRES

 

 

30,000 S.F.

 

200'

 

 

200'

 

 

150'

 

3:1 MAXIMUM DEPTH TO WIDTH RATIO

3:1 MAXIMUM DEPTH TO WIDTH RATIO

 

 

BERNE R-R 2.0 ACRES 150'* 4:1 MAXIMUM DEPTH TO WIDTH RATIO FOR LOTS 2 TO 5.00 ACRES (1998)

Lots with 5.01 acres or more require a minimum of 60’ of frontage

 

NOTE: Lot of 5.01 acres or more with less than 150’ frontage must have Township approved site plan

 

BLOOM R-R

 

R-1

2.0 ACRES

 

30,000 S.F.

 

150'

 

120'

 

SHARED DRIVES ALLOWED BY ADJOINING PROPERTIES WITH CORRECT ROAD FRONTAGE AFTER TOWNSHIP APPROVAL.

 

10.01 ACRES OR MORE - 60' ROAD FRONTAGE ALLOWED (No more than 2 lots per every 210' of road frontage)

 

CLEARCREEK       * LESS THAN 5.01 ACRES = 125' OF FRONTAGE ALLOWED** 5.01 OR MORE ACRES = 60' OF FRONTAGE ALLOWED
GREENFIELD R-1 1.5 ACRES 150'  
HOCKING

R-R

 

2.0 ACRES

 

 

 

150'

 

 

 

5:1 MAXIMUM DEPTH TO WIDTH RATIO ON LOTS LESS THAN 15 ACRES. 
435' minimum lot depth.
LIBERTY R-R

 

 

2.0 ACRES

 

 

  2 TO 5 ACRES = 175'

5.01 TO 14.99 ACRES = 300'

15 OR MORE ACRES = 60'

 

MADISON       *LESS THAN 5.01 ACRES = 125' OF FRONTAGE ALLOWED
 

*5.01 OR MORE ACRES = 60' OF FRONTAGE ALLOWED

 

PLEASANT A-1

 

R-1

 

R-R

 

5.0 ACRES

 

30,000 S.F.

 

2.0 ACRES

 

300'

 

125'

 

175'

 

3:1 MAXIMUM DEPTH TO WIDTH RATIO

4.5:1 MAXIMUM DEPTH TO WIDTH RATIO

3:1 MAXIMUM DEPTH TO WIDTH RATIO

 

RICHLAND R-1 1.5 ACRES 150'  
RUSHCREEK R-R 1.5 ACRES 175'  
VIOLET R-1

 

 

 

 

 

R-2

 

20,000 S.F.

(USE 30,000 S.F.)

 

 

 

 

30,000 S.F.

 

100' (USE 125')/ 125' LOTS 2 ACRES OR MORE

 

 

120' (USE 125') 125' LOTS 2 ACRES OR MORE

 

**125' FRONTAGE RE: SUBDIVISION REGULATIONS

 

 

 

**125' FRONTAGE RE: SUBDIVISION REGULATIONS

 

WALNUT R-R

 

R-1

 

R-2

 

2.0 ACRES

 

30,000 S.F.

30,000 S.F.

200'

 

120' (USE 125')

 

120' (USE 125')

 

 

**125' FRONTAGE RE: SUBDIVISION REGULATIONS